Read Defense Infrastructure: Dod's Excess Capacity Estimating Methods Have Limitations - U.S. Government Accountability Office | ePub
Related searches:
These commercial infrastructure assets are addressed by other sector-specific agencies.
The dod's general purpose enterprise cloud, also known as the joint enterprise defense infrastructure (jedi) cloud, is the initiative that will deploy foundational.
Even prior to the audit’s completion in november, defense officials had concerns about the department’s most recent estimate of its excess capacity, from october 2017, which showed that 19 percent of its infrastructure is excess to its needs.
Since 1988, dod has relied on the brac process as a primary means of reducing excess infrastructure or capacity and realigning bases to meet changes in the size and structure of its forces. In 1998 and 2004, congress required dod to submit reports that, among other things, estimated the amount of dod's excess capacity at that time.
− there is excess inventory and capacity within the depots that could be addressed through another brac.
Defense infrastructure department of defense's excess capacity estimating methods have limitations dod's excess capacity estimating methods have limitations note title from title screen (viewed july 3, 2013).
Defense infrastructure dod's excess capacity estimating methods have limitations report to congressional committees.
45, volume 4, “defense critical infrastructure program (dcip): defense critical asset (dca) nomination and submission process,” march 20, 2009 cancels: dod manual 3020. 45 volume 2, “defense critical infrastructure program (dcip): dcip remediation planning,” october 28, 2008, as amended dod manual 3020.
In our 2011 high risk report, we narrowed dod support infrastructure management to 2 major areas for improvement—reducing excess and consolidating facilities on joint bases.
A dod study released in march estimated that dod has 22 percent excess facilities. A new brac round would cost about $5 billion upfront and, once fully implemented, produce $2–3 billion in savings annually. It would only close a few percent of the excess, leaving capacity for future force expansion or mobilization.
Even with higher force levels than we have today, 19% of the defense department’s infrastructure capacity would be excess to its requirement, including 29% excess capacity for the army and 28% for excess capacity for the air force.
Due in part to challenges the department of defense (dod) faces in reducing excess and obsolete infrastructure, dod’s support infrastructure management is on gao’s high risk list of program areas that are vulnerable to fraud, waste, abuse, and mismanagement, or are most in need of transformation.
The firefighter property program (ffp) refers to one of the department of defense's (dod) special programs where firefighters can get excess dod property to be used for firefighting and emergency services. Certain property obtained from this program passes ownership after it has been in use for a specified period of time.
The department of defense's (dod) military construction program provides of realigning and closing bases to reduce excess infrastructure will take several.
A discussion of categories of excess infrastructure, and an assessment of the value of retaining certain excess infrastructure. Dod's report partially addressed the element to include a description of the infrastructure capacity required to support the force structure.
Department of defense infrastructure capacity [open pdf - 369 kb ] this report demonstrates the department of defense (dod) has 19 percent excess.
Dla disposition services is part of the united states defense logistics agency. Responsible for engineering and infrastructure in iraq, said: as you know we have been here for over.
Beginning in the late 1980s, congress acted to eliminate excess military infrastructure by authorizing four rounds of base realignment and closure (brac) in 1988, 1991, 1993, and 1995. Congress approved a new round of brac in 2005 to further streamline and modernize dod’s infrastructure.
“as department of defense leadership has repeatedly testified, spending resources on excess infrastructure does not make sense,” work wrote.
Tests, implements, deploys, maintains, reviews, and administers the infrastructure hardware and software that are required to effectively manage the computer network defense service provider network and resources. Monitors network to actively remediate unauthorized activities.
– reduce excess defense infrastructure – note that previous four brac rounds saved $14b – increase efficiency in existing processes • initiatives – the number one defense reform priority—base realignment and closure – leasing – saving defense dollars by demolition and disposal of excess defense facilities.
The department of defense (dod) owns more than 562,000 military support facilities including barracks, commissaries, labs, and office buildings. These facilities are located on more than 5,000 sites covering more than 28 million acres worldwide.
On april 14, 2016, the deputy secretary of defense sent the congressional defense committees an interim report which documents that the dod has 22 percent excess infrastructure capacity compared to projected fy 2019 force levels.
18 oct 2019 chad harris, project manager for defensive cyber operations at the army “you can never have too much collaboration, harris said.
The department of defense (dod), domestic preparedness support initiative (dpsi) office coordinates with first responders at the federal, state, and local level to identify capability gaps and bring awareness to dod’s excess property and “dual-use” technology.
Since 1997, we have designated the department of defense s (dod) support infrastructure management as a high-risk area, in part due to the challenges dod faces in reducing excess and obsolete infrastructure. 1 dod reports that, as of the end of fiscal year 2013, the global real property portfolio it manages consisted of more than 562,000 facilities (buildings, structures, and linear structures2.
Department of defense infrastructure capacity [open pdf - 369 kb] this report is provided in response to section 2815 of the national defense authorization act (ndaa) for fiscal year (fy) 2016 (public law 114-92), and is a follow-on to the interim capacity report submitted in march 2016.
Reductions called for by the quadrennial defense review and others already planned by dod would reduce military and dod civilian personnel end strength.
Gao has designated the department of defense’s (dod) management of support infrastructure as a high risk area, in part because of challenges in reducing excess infrastructure. Operating and maintaining excess facilities consumes resources that could be eliminated from dod’s budget or used for other purposes.
The defense logistics agency (dla) conditionally transfers excess dod property to local law enforcement agencies.
The department of defense (dod) has approximately 20 percent excess infrastructure, [ref] and the best way to reduce this excess capacity is through a new round of brac.
Now, facing an expected wave of modernization bills in the next decade, a top dod official has suggested the building needs to look for alternative ways to shut down excess infrastructure.
18 oct 2017 defense secretary jim mattis is asking congress to allow the pentagon permission to study the potential savings from a new round of base.
Infrastructure through a new round of brac and promises that the dod will present options to congress on how to reduce excess infrastructure.
The dod carries excess infrastructure and needs a new round of brac to reduce the excess and save $2 billion.
Gao noted that: (1) infrastructure reform within dod is an extremely difficult task but one that is very much needed; (2) therefore, gao strongly supports the need to further reduce excess support.
Welcome to the dcip web portal, dedicated to providing information about the defense critical infrastructure program (dcip) within the office of the assistant secretary of defense (homeland defense and americas' security affairs) the purpose of this web portal is to inform and educate the general public, members of the armed forces, and our interagency and intergovernmental partners, as well as to assist in outreach to our private sector partners.
Defense infrastructure dod needs to improve the accuracy of its excess capacity estimates what gao found the department of defense’s (dod) 2017 infrastructure capacity report addressed four of five required elements from section 2815 of the national defense authorization act (ndaa) for fiscal year 2016.
Dod recently concluded that 22 percent of its infrastructure capacity is excess to need. 6 the department may decide to maintain some excess facilities in case forces have to expand to meet national security needs. But savings from eliminating even a portion of this excess infrastructure would be substantial.
Government accountability office recently released its high-risk area list for the department of defense, this year’s iteration removed infrastructure management for the department’s commitment to improving certain facets of the critical area. Areas improved from the 2019 high-risk report included, “pursuing efforts to relocate from costly commercial leased space to nearby.
The march 2016 defense department report details significant excess infrastructure capacity in the hopes of nudging a reluctant congress to support another round of base realignments and closures. Dod report to congress on excess infrastructure capacity insidedefense.
Dod recognizes that it maintains infrastructure in excess of its needs, 1 and that it faces challenges in allocating sufficient funds to maintain this infrastructure and supporting other base operating needs.
5 the connection is further reinforced by the 2018 nds, calling explicitly for reductions in excess infrastructure through a new round of brac and promises that the dod will present options to congress on how to reduce excess infrastructure.
It is dod policy consistent with reference (e) that excess dod property must be screened and redistributed among the dod components, and reported as excess to the general services administration (gsa).
This report demonstrates the department of defense (dod) has 19 percent excess capacity using a fy 2012 force structure.
25 apr 2019 1988 round: the defense authorization amendments and base dod force structure plan, infrastructure inventory, and analysis of a brac process is the chief means by which dod disposes of excess infrastructure.
As noted in the national defense strategy, we continue to reduce excess infrastructure and will work with congress for options for base realignment and closures.
The revelation of excess pentagon infrastructure also comes as president trump decides whether to declare a national emergency on the southern border with mexico, potentially allowing him to raid.
Instead, defense department comptroller david norquist suggested in february that he would be looking for new ways to work with jobs-conscious lawmakers and new ways to use the excess property.
Consistent with legal requirements, the department uses situation-appropriate methods to eliminate obsolete, inefficient, and underutilized support infrastructure. For example, dod may demolish and rebuild or renovate an obsolete facility to satisfy newer operational or mission requirements.
Dod estimates that, in the aggregate, there is a 22 percent excess in base infrastructure across the enterprise. B) maintaining such a high level of excess infrastructure further reduces available.
Infrastructure owned, operated or provided by the department of defense. Defense infrastructure sectors include the dii, c3, space, isr, financial services, logistics, public works (includes dod-owned or -operated utilities, roads, rails and railheads and their interface to commercial and other government systems), personnel, health affairs and emergency preparedness.
The defense logistics agency's (dla's) law enforcement support office (leso) provides excess department of defense property — everything from desks to rifles to airplanes — to local, state, tribal, and federal law enforcement agencies (leas) across the united states.
23 may 2014 review aimed at shedding excess infrastructure on the continent, the the defense department emphasized that none of the closures will.
Defense infrastructure dod needs to improve the accuracy of its excess capacity estimates what gao found the department of defense’s (dod) 2017 infrastructure capacity report addressed four of five required elements from section 2815 of the national defense authorization act (ndaa) for fiscal year 2016.
Memorandum for defense industrial base subject: defense industrial base essential critical infrastructure workforce the defense industrial base (dib) is identified as a critical infrastructure sector by the department of homeland security.
2 jan 2018 the department of defense (dod) has significant experience in planning for and washington headquarters services, as the infrastructure owning/managing components.
Dod has proposed conducting another brac round to divest excess infrastructure in their budget every year between fy 2013 and fy 2018 (after the completion of the fy 2005 brac), citing excess capacity in the current and projected force structure levels, but these proposals have met sharp resistance from the congress.
The fiscal 2019 national defense authorization act does order a new dod infrastructure capacity report which is due next february. Defense officials could make a case in the report for additional closures as similar recent dod reports have shown excess capacity of between 19 and 22%, according to the report.
The report (attached, with a letter from the secretary of defense) shows that, even using a baseline of dod’s larger 2012 force structure instead of the current structure, the department of defense has 19% excess infrastructure capacity. That figure includes 29% excess capacity for the army and 28% excess capacity for the air force.
It is dod policy consistent with reference (d) that excess dod property must be screened and redistributed among the dod components, and reported as excess to the general services administration (gsa).